Microsoft Pn7-00019 Bluetooth 4.0 4-Way Scroll Wheel Blue Track Technology Mouse – Dark Red
Original price was: KSh 4,000.00.KSh 2,500.00Current price is: KSh 2,500.00.- Bluetooth 4.0
- 4-Way scroll wheel
- Blue Track Technology
Microsoft Power Automate Per Flow Plan CFQ7TTC0LH13-1
Original price was: KSh 25,000.00.KSh 21,500.00Current price is: KSh 21,500.00.Microsoft Project Plan 1 CFQ7TTC0HDB1-2
Original price was: KSh 3,000.00.KSh 2,200.00Current price is: KSh 2,200.00.- Task Management: Create, assign, and track tasks within your team.
- Collaboration Tools: Work together seamlessly with integrated communication tools.
- Time Tracking: Record and report on the time spent on various tasks and projects.
- File Sharing: Share and manage documents related to your projects.
- Reporting: Generate detailed project reports for analysis and decision-making.
Microsoft Project Plan 3 CFQ7TTC0HDB0-2
Original price was: KSh 8,000.00.KSh 6,800.00Current price is: KSh 6,800.00.- Leverage Copilot in Planner (preview)1 to generate new plans, set goals, track status, and react to changes as projects evolve.
- Use rich planning and status tracking capabilities, with features such as advanced dependencies with lead-lag, critical path, and task history.
- Manage scheduling and costing and allocate resources with resource management capabilities.
- Each subscription license allows for up to five concurrent installations of the Project Online desktop client.
Microsoft Project Plan 5 CFQ7TTC0HD9Z-2
Original price was: KSh 15,000.00.KSh 12,400.00Current price is: KSh 12,400.00.- Project Home. Centralized view and quick access to projects
- Grid, Board, Timeline (Gantt) view to plan/manage projects
- Share documents and collaborate with the Microsoft Team
- Coauthoring. Edit and update task lists, project schedules
- Project planning and scheduling
- Reporting. Pre-built reports to track progress
- Timesheet submissions
- Resource management
- Build visual, interactive roadmaps by aggregating different projects
- Anytime/anywhere access through a Web interface
Microsoft Project Pro 2021 Win All Lng ESD NR (H30-05939)
Original price was: KSh 249,000.00.KSh 247,400.00Current price is: KSh 247,400.00.- Collaborate with others to easily start and deliver winning projects. Includes all the features of Project Standard plus collaboration tools, resource management, SharePoint task sync, submit timesheets, and more
- Licensed for 1 PC
- All languages included
- Office ESD is not eligible for return or exchange
Microsoft Project Standard 2021 ESD Download 076-05905
Original price was: KSh 149,000.00.KSh 147,400.00Current price is: KSh 147,400.00.- Category: Office applications – projects/process
- Product Type: License
- Platform: Windows
- Distribution Media: Download
- Language: All Languages
- License Qty: 1 license
- Details: National Retail, Click-to-Run – ESD
Microsoft sharepoint std 2019- DG7GMGF0F4LS:0003
Original price was: KSh 16,500.00.KSh 14,500.00Current price is: KSh 14,500.00.- Microsoft
- 41299063
- DG7GMGF0F4LS:0003
- In Stock
Microsoft Surface Pen – Black
Original price was: KSh 27,000.00.KSh 23,000.00Current price is: KSh 23,000.00.- Precision Writing and Drawing: The Surface Pen offers high precision for writing, drawing, and sketching on compatible devices, providing a natural and responsive experience.
- Pressure Sensitivity: With varying levels of pressure sensitivity, users can achieve different line thicknesses and shading effects, similar to using a traditional pen or pencil.
- Tilt Support: Tilt support allows for shading techniques and enhanced control when using the Surface Pen at different angles, providing a more versatile creative tool.
- Magnetic Attachment: The Surface Pen features a magnetic attachment mechanism, allowing it to securely attach to compatible Surface devices for convenient storage and easy access.
Microsoft Surface PRO 4 Tablet Replacement LCD Touchscreen
Original price was: KSh 25,000.00.KSh 20,000.00Current price is: KSh 20,000.00.- Item Condition: Brand New
- High-Quality Replacement Touch Screen Digitizer LCD
- Touch screen digitizer and LCD
- Repair/Replacing old, broken, cracked, damaged, faulty touchscreen LCD
- Precision cut for a perfect fit.
- Color: Black
- Compatible Model: Microsoft Surface Pro 4 1724
Microsoft Surface Pro 5 LCD & Touch Screen Assembly
Original price was: KSh 30,000.00.KSh 25,000.00Current price is: KSh 25,000.00.- Brand: Microsoft
- Form Factor: 2 – in – 1 laptop
- Condition: Refurbished
- Storage & Memory
- 7th Generation
- Processor speed: 2.60 GHz
- Windows 10 Pro & Office Installed
- Compatibility: Microsoft Surface Pro 5
Microsoft Surface Pro 8/9 Signature Keyboard – QJW-00015
Original price was: KSh 45,000.00.KSh 42,000.00Current price is: KSh 42,000.00.- For Surface Pro 8 & Surface Pro 9
- Mechanical Keys
- Large Glass Touchpad
- Windows Shortcut & Control Keys
- Magnetic Attachment
- Surface Slim Pen 2 Storage & Charging
- Alcantara Material Covering